Dongguan Municipal Sewage Treatment Plant

Case studies Dongguan Municipal Sewage Treatment Plant WHEN March 2023 LOCATION Dongguan City, Guangdong, China PROCESSING CAPACITY 20-30 Wet Tonnes / Day WHEN March 2023 LOCATION Dongguan City, Guangdong, China PROCESSING CAPACITY 20-30 Wet Tonnes / Day http://newwaytech.ca/wp-content/uploads/2024/03/Newway-sluge-cake-1.mov After the process, the average moisture content of the dry cake is 34.4%, the sludge volume is…

Changsha Wangcheng District Treatment Plant

Case studies Changsha Wangcheng District Treatment Plant WHEN November 2021 LOCATION Wangcheng District, Changsha City, Hunan, China PROCESSING CAPACITY 6 Dry Tonnes / Day WHEN November 2021 LOCATION Wangcheng District, Changsha City, Hunan, China PROCESSING CAPACITY 6 Dry Tonnes / Day The plant has an embedded MIR-D system to treat wet sludge, reducing the sludge…